The depth of the reservoir | 750 m | Initial reservoir pressure | 7.34 MPa |
Average reservoir thickness | 52.7 m | Initial reservoir temperature | 38 °C |
Porosity | 26.6% | Well spacing of vertical steam injection well | 70 m |
Permeability | 1 700× 10-3 μm2 | Well spacing between the vertical steam injection well and horizontal production well | 35 m |
Initial oil saturation | 70% | Length of horizontal section | 400 m |