|
|
Optimization of refracturing timing for horizontal wells in tight oil reservoirs: A case study of Cretaceous Qingshankou Formation, Songliao Basin, NE China
|
Jianchun GUO,Liang TAO,Fanhui ZENG
|
|
|
Table 3 Comparison of cumulative oil production increment with different refracturing methods.
|
|
Refracturing method | Initial daily oil production/tons | Cumulative oil production increment/104 tons | Cumulative oil production increment percentage/% | Refracturing of preexisting fractures | 22.1 | 0.388 | 21.9 | Existent fracture extension | 30.7 | 0.579 | 32.7 | Inter-fracture treatment | 42.3 | 0.878 | 49.6 | Temporary plugging and diverting inside fractures | 35.8 | 0.802 | 45.3 |
|
|
|