Practice and understanding of sidetracking horizontal drilling in old wells in Sulige Gas Field, NW China
ZHANG Jinwu,WANG Guoyong,HE Kai,YE Chenglin
Table 2 Production statistics of sidetracking horizontal wells.
Serial
number
Well Date of
production
Before sidetracking After sidetracking December 31, 2017
Daily gas pro-
duction/104 m3
Cumulative gas production/104 m3 Initial wellhead pressure/MPa Initial daily gas production/104 m3 Daily gas production/104 m3 Production increment/104 m3
1 Su10-aCH 2011-07-20 0 235 13.5 1.8 0 545
2 Su10-bCH 2012-08-28 0.10 862 16.0 2.8 0.82 2 161
3 Su10-cCH 2015-05-27 0 252 21.0 4.5 1.16 2 017
4 Su10-dCH 2015-12-06 0 195 19.5 3.5 1.39 1 067
5 Su53-aCH 2016-12-03 0 280 17.2 3.5 1.42 634
6 Su53-bCH 2017-03-14 0.10 975 21.0 9.0 5.32 2 053
7 Su53-cCH 2017-03-19 0.10 401 19.5 5.0 3.95 1 008
8 Su53-dCH 2017-04-04 0.15 703 5.9 6.0 2.85 905
9 Su53-eCH 2017-04-24 0.05 312 14.2 3.0 3.30 1 048
10 Su53-fCH 2017-10-18 0.10 1 521 20.0 11.0 11.65 680
11 Su53-gCH 2017-11-07 0.03 552 14.0 3.0 3.17 192
12 Su53-hCH 2017-11-21 0.07 535 13.0 3.5 3.88 133
Average 0.06 568 16.2 4.7 3.24 1 037