Using cyclic alternating water injection to enhance oil recovery for carbonate reservoirs developed by linear horizontal well pattern
LI Yong,ZHAO Limin,WANG Shu,SUN Liang,ZHANG Wenqi,YANG Yang,HU Dandan,CHEN Yihang
Table 2 Adjustment and optimization of injection-production parameters of different alternating well patterns.
Block Alternating well
patterns
Injection-
production well
Daily injection and production rate
in the first half cycle (30 days)
Daily injection and production rate
in the second half cycle (30 days)
Odd-numbered
columns
Even-numbered
columns
Odd-numbered
columns
Even-numbered
columns
Block M1 Inverted seven-spot alternating water
injection
Production
well
Increase to 1.2-1.4 times liquid production rate Decrease to 0.6-0.8 times liquid production rate Decrease to 0.6-0.8 times liquid production rate Increase to 1.2-1.4 times liquid production rate
Injection
well
Shut down Increase to 2 times
water injection rate
Increase to 2 times
water injection rate
Shut down
Block M2 Five-spot alternating water
injection
Production
well
Increase to 1.0-1.5 times liquid production rate Shut down Shut down Increase to 1.0-1.5 times liquid production rate
Injection
well
Shut down Increase to 1.0-1.5 times water injection rate Increase to 1.0-1.5 times water injection rate Shut down
Block M3 Periodic differential alternating water
injection
Production
well
Increase to 1.2 times liquid production rate Decrease to 0.8 times liquid production rate Decrease to 0.8 times liquid production rate Increase to 1.2 times
liquid production rate
Injection
well
Decrease to 0.5 times water injection rate Increase to 1.5 times water injection rate Increase to 1.5 times
water injection rate
Decrease to 0.5 times water injection rate