Integrated construction technology for natural gas gravity drive and underground gas storage
JIANG Tongwen,WANG Zhengmao,WANG Jinfang
Table 1 Difference between integrated construction and conventional gas storage.
UGS con-
struction method
Construction time Working mode Operation mode
Formation pressure Pore fluid Cushion
gas scale
Injection and production scale Working gas volume Profit
model
Gas injection pressure Technology Stress
change
Integrated UGS con-
struction
High
formation
pressure
Saturated oil-gas-water three phases Natural
formation
after oil displacement
Improve
single-well oil production
Less to more Deposit
transfer fee
of oil and gas
High
pressure gas injection
Huff and puff from small scale to
large scale
Small change of periodic stress
Gas
reservoir
UGS
Close to
abandonment
pressure
Low-pres-
sure saturated gas
Need large scale
cushion gas
Improve
single well productivity
Improve the working gas volume Deposit
transfer
fee of gas
Low pressure to high
pressure
Large scale huff and puff High-strength stress change