|
|
Production calculation of the second and tertiary recovery combination reservoirs under chemical flooding
|
LIU Weidong,WANG Gaofeng,LIAO Guangzhi,WANG Hongzhuang,WANG Zhengmao,WANG Qiang,WANG Zhengbo
|
|
|
Table 1 Comparison of individual well production at water flooding stage of STRC.
|
|
Test area | Reservoir type | Individual well production of water flooding in different well patterns/(t•d-1) | Individual well production ratio of new and old well patterns | Old well pattern | New well pattern | Jilin North H79 | Sandstone | 1.20 | 0.80 | 0.67 | Dagang GX2 | Sandstone | 1.91 | 1.71 | 0.90 | Dagang KY | Sandstone | 3.45 | 2.64 | 0.76 | Dagang G109-1 | Sandstone | 4.67 | 3.00 | 0.64 | Liaohe J16 | Sandstone | 3.93 | 2.81 | 0.71 | Expansion of Changqing AS | Sandstone | 1.71 | 1.54 | 0.90 | Xinjiang QZ | Conglomerate | 2.50 | 3.39 | 1.35 | Xinjiang QD1 | Conglomerate | 11.84 | 16.50 | 1.39 |
|
|
|