[1] 白宝君, 周佳, 印鸣飞. 聚丙烯酰胺类聚合物凝胶改善水驱波及技术现状及展望[J]. 石油勘探与开发, 2015, 42(4): 481-487.
BAI Baojun, ZHOU Jia, YIN Mingfei. A comprehensive review of polyacrylamide polymer gels for conformance control[J]. Petroleum Exploration and Development, 2015, 42(4): 481-487.
[2] 刘佳声. 稠油边底水油藏水平井堵水技术改进与试验[J]. 当代化工, 2013, 42(3): 290-293.
LIU Jiasheng. Improvement and test of water plugging technology for horizontal wells in heavy oil reservoirs with edge and bottom water[J]. Contemporary Chemical Industry, 2013, 42(3): 290-293.
[3] 李涛. 高温高压套损井膨胀管修复技术[J]. 石油勘探与开发, 2015, 42(3): 374-378.
LI Tao. Solid expandable tubular patching technique for high-temperature and high-pressure casing damaged wells[J]. Petroleum Exploration and Development, 2015, 42(3): 374-378.
[4] PETROWIKI. Foamed cement[EB/OL]. (2015-06-25)[2017-03-26]. http://petrowiki.org/Foamed_cement.
[5] HARLAN T D, FOREMAN J M, REED S D, et al. Foamed cement selection for horizontal liners proves effective for zonal isolation: Case history[R]. SPE 71055-MS, 2001.
[6] 梁晓芳, 张红岗. 水平井找堵水技术研究及应用[J]. 石油化工应用, 2014, 33(1): 46-49.
LIANG Xiaofang, ZHANG Honggang. Research and appilcation of horiziontal well plugging water technology[J]. Petrolchemical Industry Application, 2014, 33(1): 46-49.
[7] DAI Licai, QING You, XIE Yuhong, et al. Case study on polymer gel to control water coning for horizontal well in offshore oilfield[R]. OTC 21125-MS, 2011.
[8] ZAITOUN A, KOHLER N, MONTEMURRO M. Control of water influx in heavy-oil horizontal wells by polymer treatment[R]. SPE 24661-MS, 1992.
[9] BAI Baojun, HUANG Fusheng, LIU Yuzhang, et al. Case study on preformed particle gel for in-depth fluid diversion[R]. SPE 113997-MS, 2008.
[10] PEIRCE J W, HUTCHERSON M R, JENSEN M D, et al. An overview of conformance control efforts for the West Sak Field on the North Slope of Alaska[R]. SPE 169073-MS, 2014.
[11] HALLIBURTON. Micro matrix cement[EB/OL]. (2016-05-16)[2017- 04-12]. http://www.halliburton.com/public/cem/contents/data_sheets/ web/h/h00693.pdf.
[12] 刘怀珠, 李良川, 梁超. 水平井选择性化学堵水技术在高尚堡油田浅层油藏的应用研究[J]. 油田化学, 2010, 27(4): 428-430.
LIU Huaizhu, LI Liangchuan, LIANG Chao. Application of horizontal well selective chemical water shutoff technology on Gaoshangpu Oilfield swallow reservoir[J]. Oilfield Chemistry, 2010, 27(4): 428-430.
[13] 李宜坤, 魏发林, 路海伟, 等. 水平井化学控水技术研究与应用[J]. 石油工业技术监督, 2011, 27(6): 50-54.
LI Yikun, WEI Falin, LU Haiwei, et al. Horizontal well water control for chemical research and application[J]. Technology Supervision in Petroleum Industry, 2011, 27(6): 50-54.
[14] 马广博, 董金平, 刘中良, 等. 水平井选择性化学堵水技术在高尚堡浅层油藏中的研究与应用[J]. 内蒙古石油化工, 2011(14): 113-114.
MA Guangbo, DONG Jinping, LIU Zhongliang, et al. Selective chemical water plugging technique in horizontal well in Gaoshangpu shallow oil reservoir in the research and application[J]. Inner Mongolia Petrochemical Industry, 2011(14): 113-114.
[15] UDDIN S, DOLAN J D, CHONA R A, et al. Lessons learned from the first openhole horizontal well water shutoff job using two new polymer systems: A case history from Wafra Ratawi Field, Kuwait[R]. SPE 81447-MS, 2003.
[16] LONGACRE S A, GINGER E P. Evolution of the Lower Cretaceous Ratawi Oolite reservoir, Wafra Field, Kuwait-Saudi Arabia partitioned neutral zone[J]. Giant Oil and Gas Fields, 1988(12): 273-331.
[17] UTOMO B, AL-HARBI M, RAZZAK S, et al. Innovative water shut off solution combining real time downhole measurement and analysis with zonal isolation technologies for horizontal open hole producer in Ratawi Field: A case history from partitioned zone[R]. SPE 145901-MS, 2011.
[18] DASHASH A A, AL-ARNAOUT I, AL-DRIWEESH S M, et al. Horizontal water shut-off for better production optimization and reservoir sweep efficiency (case study)[R]. SPE 117066, 2008.
[19] STENGER B, PHAM T, AL-AFALEG N. Tilted original oil/water contact in the Arab-D reservoir, Ghawar Field, Saudi Arabia[J]. GeoArabia, 2003, 8(1): 9-39.
[20] SHARMA H, DUARTE J, MUFEED E, et al. Lessons learnt from water shutoff of horizontal wells using inflatable packers and chemicals in Ghawar Field of Saudi Arabia[R]. IPTC 16637, 2013.
[21] SAUDI M, AL-UMRAN M I. Inflatable enables successful water shutoff in high angle wellbores in Ghawar Field[R]. SPE 93261-MS, 2005.
[22] AL-ZAIN A, DUARTE J, HALDAR S, et al. Successful utilization of fiber optic telemetry enabled coiled tubing for water shut-off on a horizontal oil well in Ghawar Field[R]. SPE 126063, 2009.
[23] LANE R, SERIGHT R. Gel water shutoff in fractured or faulted horizontal wells[R]. SPE 65527-MS, 2000.
[24] SNAAS A, ALVAREZ D. Successful water shut off in extended reach horizontal wells using inflatable technology[R]. IPTC 12410-MS, 2008.
[25] 周勇. 我国水平井完井技术综述[J]. 中国石油和化工标准与质量, 2012, 33(15): 75.
ZHOU Yong. Overview of horizontal well completion technology in China[J]. China Petroleum and Chemical Standar and Quality, 2012, 33(15): 75.
[26] 董长银, 张清华, 高凯歌, 等. 机械筛管挡砂精度优化实验及设计模型[J]. 石油勘探与开发, 2016, 43(6): 991-996.
DONG Changyin, ZHANG Qinghua, GAO Kaige, et al. Screen sand retaining precision optimization experiment and a new empirical design model[J]. Petroleum Exploration and Development, 2016, 43(6): 991-996.
[27] 徐鑫. 水平井控流筛管完井技术研究及应用[J]. 石油钻探技术, 2014, 42(3): 71-75.
XU Xin. Development and application of flow control screen completion for horizontal wells[J]. Petroleum Drilling Techniques, 2014, 42(3): 71-75.
[28] FOUCAULT H, POILLEUX D, DJURISIC A, et al. A successful experience for fiber optic and water shut off on horizontal wells with slotted liner completion in an extra heavy oil field[R]. SPE 89405-MS, 2004.
[29] ZAITOUN A, PICHERY T. A successful polymer treatment for water coning abatement in gas storage reservoir[R]. SPE 71525-MS, 2001.
[30] ZAITOUN A, KOHLER N, BOSSIE-CODREANU D, et al. Water shutoff by relative permeability modifiers: Lessons from several field applications[R]. SPE 56740-MS, 1999.
[31] 袁辉, 李耀林, 朱定军, 等. 海上油田水平井控水油藏方案研究及实施效果评价: 以 Wen8-3-A2h 井为例[J]. 科学技术与工程, 2013, 13(4): 996-1002.
YUAN Hui, LI Yaolin, ZHU Dingjun, et al. Reservoir project research and implementation effect evaluation of offshore oilfield horizontal well water controlled: For example Wen8-3-A2h[J]. Science Technology and Engineering, 2013, 13(4): 996-1002.
[32] TUDBALL I C, MCGINN P, WATSON D. Successful coiled-tubing water-shutoff solution for a sand-screen horizontal completion using novel fluids[R]. SPE 94175-MS, 2005.
[33] 刘怀珠, 李良川, 郑家朋, 等. 水平井选择性化学堵水技术在冀东油田浅层边底水油藏的研究与应用[J]. 石油地质与工程, 2010, 24(2): 109-111.
LIU Huaizhu, LI Liangchuan, ZHENG Jiapeng, et al. Application of selective permeability reduction agent in Jidong Oil field[J]. Petroleum Geology and Engineering, 2010, 24(2): 109-111.
[34] VASQUEZ J, RODRIGUEZ L. A water swelling polymer for fracture shutoff to improve injection profile during secondary recovery: Case histories and lessons learned after more than 600 well interventions[R]. SPE 174292-MS, 2015.
[35] BEAMAN D J, BRINK D I, RITCHIE B, et al. Qualification and deployment of a unique polymer conformance control system[R]. IPTC 13074-MS, 2009.
[36] ARANGATH R, MKPASI E. Water shut-off treatments in open hole horizontal wells completed with slotted liners[R]. SPE 74806-MS, 2002.
[37] 张国文, 钱杰, 刘凤, 等. 水平井控水完井管柱的研究与应用[J]. 石油机械, 2013, 41(3): 89-91.
ZHANG Guowen, QIAN Jie, LIU Feng, et al. Research and application of the water control completion string for horizontal wells[J]. China Petroleum Machinery, 2013, 41(3): 89-91.
[38] 王金忠, 肖国华, 陈雷, 等. 水平井管内分段调流控水技术研究与应用[J]. 石油机械, 2011, 39(1): 60-61.
WANG Jinzhong, XIAO Guohua, CHEN Lei, et al. Research and application of the staged flow regulating and water control technology with screen or tubing in horizontal wells[J]. China Petroleum Machinery, 2011, 39(1): 60-61.
[39] 饶富培, 董云龙, 吴杰生, 等. 大港油田底水油藏水平井控水完井工艺[J]. 石油钻采工艺, 2010, 32(3): 107-109.
RAO Fupei, DONG Yunlong, WU Jiesheng, et al. Technology of water control and well completion of horizontal wells in bottom water reservoir in Dagang Oilfield[J]. Oil Drilling & Production Technology, 2010, 32(3): 107-109.
[40] 杨进先. 底水气藏水平井控水技术[J]. 中国石油和化工标准与质量, 2012, 33(15): 143.
YANG Jinxian. Water shutoff technology in bottom water reservoirs[J]. China Petroleum and Chemical Standar and Quality, 2012, 33(15): 143.
[41] 张瑞霞, 王继飞, 董社霞, 等. 水平井控水完井技术现状与发展趋势[J]. 钻采工艺, 2012, 35(4): 35-37.
ZHANG Ruixia, WANG Jifei, DONG Shexia, et al. Status and development trends of water-controlling cpmpletion technology of horizontal well[J]. Drilling and Production Technology, 2012, 35(4): 35-37.
[42] BUROV A, KHARRAT W, HUSSEIN N A. Innovative coiled tubing water shutoff techniques in horizontal wells[R]. SPE 149651-MS, 2012.
[43] 陈维余, 孟科全, 朱立国. 水平井堵水技术研究进展[J]. 石油化工应用, 2014, 33(2): 1-4.
CHEN Weiyu, MENG Kequan, ZHU Liguo. Progress in research on water shutoff for horizontal well[J]. Petrolchemical Industry Application, 2014, 33(2): 1-4.
[44] 李宜坤, 胡频, 冯积累, 等. 水平井堵水的背景、现状及发展趋势[J]. 石油天然气学报(江汉石油学院学报), 2005, 27(3): 757-760.
LI Yikun, HU Pin, FENG Jilei, et al. Background, current situation and trend of development for water shutoff in horizontal wells[J]. Journal of Oil and Gas Technology (J.JPI), 2005, 27(3): 757-760.
[45] BOND A, BLOUNT C, DAVIES S, et al. Novel approaches to profile modification in horizontal slotted liners at Prudhoe Bay, Alaska[R]. SPE 38832-MS, 1997.
[46] 朱怀江, 徐占东, 罗健辉, 等. 水平井调堵技术最新进展[J]. 油田化学, 2004, 21(1): 85-90.
ZHU Huaijiang, XU Zhandong, LUO Jianhui, et al. Technologies of water and gas shutoff in horizontal wells: An overview[J]. Oilfield Chemistry, 2004, 21(1): 85-90.
[47] 于洪江, 张凤武. 侧钻水平井机构堵水工艺技术[J]. 大庆石油地质与开发, 1997, 16(3): 56-58.
YU Hongjiang, ZHANG Fengwu. Deviate well water control in Daqing Oil Field[J]. Petroleum Geology & Oilfield Development in Daqing, 1997, 16(3): 56-58.