| 1 | WIMP(k-1)- WIP(k-1) | One time step delayed pressure difference along the wellbore |
| 2 | THT-GLR | Random combination |
| 3 | WIMP-WIP | The pressure difference along the injection wellbore |
| 4 | WIP/WIMP | The pressure ratio of bottomhole and surface |
| 5 | THP/GLR | Related to gas lifting required to bring fluid to surface |
| 6 | CP-PMP | Pressure loss due to friction and hydrostatic column |
| 7 | (CP-PMP)THT | Random combination |
| 8 | OPR(k-1) | One time step delayed oil flow rate |
| 9 | OPR(k-2) | Two time step delayed oil flow rate |
| 10 | GPR(k-1) | One time step delayed gas flow rate |
| 11 | GPR(k-2) | Two time step delayed gas flow rate |
| 12 | WPR(k-1) | One time step delayed water flow rate |
| 13 | WPR(k-2) | Two time step delayed water flow rate |