|
|
An analysis method of injection and production dynamic transient flow in a gas field storage facility
|
WANG Jieming,LI Chun,SUN Junchang,TANG Ligen,ZHONG Rong,LIU Xianshan,ZHENG Shaojing
|
|
|
Table 3 Fitting result of injection and production dynamic transient analysis model
|
|
Injection and production cycle | Analysis stage | Permeability/ 10-3 μm2 | Skin factor | Well control radius/m | Well controlled reserves/108 m3 | 1 | Gas injection period | 4.09 | -2.28 | 285 | 2.97 | Gas production period | 5.34 | -2.30 | 291 | 3.08 | 2 | Gas injection period | 5.95 | -2.36 | 309 | 3.49 | Gas production period | 6.46 | -2.38 | 314 | 3.59 | 3 | Gas injection period | 7.18 | -2.40 | 320 | 3.74 | Gas production period | 7.01 | -2.43 | 332 | 4.02 | 4 | Gas injection period | 7.33 | -2.50 | 354 | 4.57 | Gas production period | 7.37 | -2.50 | 353 | 4.55 |
|
|
|