|
|
An intelligent identification method of safety risk while drilling in gas drilling
|
HU Wanjun,XIA Wenhe,LI Yongjie,JIANG Jun,LI Gao,CHEN Yijian
|
|
|
Table 6. Comparison between identification results and monitoring results in Dayi Well A
|
|
Well depth/m | Monitoring report and expert conclusion | Risks produce probabilistic of intelligent identification results/% | Formation gas production | Formation water production | Sticking | Connecting column | 5149.22 | Formation gas production | 97.25 | 1.71 | 0 | 0 | 5173.06 | Connecting column | 0.14 | 1.58 | 0 | 99.44 | 5174.45 | Formation gas production | 99.34 | 1.78 | 0 | 0 | 5133.02 | Connecting column | 0.96 | 2.61 | 0.02 | 99.98 | 5250.62 | Formation gas production and sticking | 98.80 | 46.13 | 99.92 | 0 | 5251.64 | Formation water production | 3.48 | 85.34 | 2.22 | 0 | 5254.58 | Formation water production | 4.15 | 83.54 | 0 | 0 | 5254.69 | Sticking drill | 1.52 | 29.02 | 96.54 | 0 |
|
|
|